(06-16-2017, 11:59 PM)plam Wrote: Hey, did we all just forget to notice more trains coming in, or is Bombardier terribly behind schedule now? Just wondering.
They are doing the static testing of all the other vehicles at the Kingston Plant instead of here. 501 is still being outfitted here so i suspect they are now doing the same to 502 at almost the same time so that when #502 gets shipped they can put it directly into track testing after post-shipping inspection. I suspect they are also having the Kingston plant install the necessary signal and train control equipment so that the rest of the vehicles can be shippped in a ready-to-test state. 502 for all intents and purposes is "assembled." At this point though I could almost see 502 and 503 being shipped together *shrugs*