04-14-2018, 10:37 PM
(This post was last modified: 04-14-2018, 10:53 PM by Pheidippides.)
(04-14-2018, 10:23 PM)Canard Wrote:(04-14-2018, 09:19 PM)Pheidippides Wrote: This is exactly why the region and city need to be reminded that projects like the current Lancaster Street Reconstruction (Victoria Street to Bridgeport Road, Design 2017 – 2019, Construction 2020) needs to be re-done as a grade separation or the chance is lost for 50 years.
Oooo, where might one find plans for this? This is the first I have heard of it!
The consultant to do the EA has been selected, but that was the last I heard of it.
It shows up in Kitchener's 2018 budget in 2021/2022 now (it will likely be a joint region and Kitchener project), but as of 2017 the region had it as 2020.
This would also be a great stretch for segregated cycling lanes.
Everyone move to the back of the bus and we all get home faster.