04-25-2018, 12:29 AM
I think you are thinking of the William St/Strange St pumping station consolidation project. That work, between John St W (Waterloo) and Glasgow St (Kitchener), isn't scheduled to start until 2019 (so yes, another IHT disruption next year). I guess it would be too much to ask for crossing at John to be rebuilt with a single, shared 5m lane in the middle with bump-outs on the north and south sides instead of the 2x5.5m lanes that are there now.
The work for 2018 is from the CN tracks north of Gage to the south side of Queen.
The work for 2018 is from the CN tracks north of Gage to the south side of Queen.
Everyone move to the back of the bus and we all get home faster.