03-30-2015, 07:34 AM
I was on the 7am bus at Conestoga to the Maple Syrup Festival, and my 7C took me by the start of their pour, before 6:30am. Around 5 or 6, they were still pouring, had three vehicles with conveyors to deposit cement in the hole, being filled by four cement trucks, with a peak line going back to Ethel's and at least 17 more cement trucks in the line, so 21 trucks at one time at least.