07-08-2019, 09:37 AM
(07-08-2019, 07:49 AM)trainspotter139 Wrote:(07-07-2019, 10:48 PM)KevinL Wrote: It would be nice to have it sorted by September.
Sorting out the ATP system will take longer than September. Sorting out the issues that are restricting speeds will take some time but much less time than fixing the ATP system. The two are being handled separately. It's really worth noting that even with the speed restrictions ION meets or exceeds the travel time requirements in the contract.
Why? What are they doing? What have they been doing for the last 2 years? It’s not like they’re figuring out how to build a Hyperloop or something; this is established, mature technology.