05-11-2017, 12:27 AM
Thanks for the Waterloo Park thoughts. After I made my post, I reviewed the multiple Waterloo Park map plans that I could find (though somehow I missed the one linked above). I generally concluded that my problem was that the current track configuration is anticipating a park trail layout that has yet to be built. It would have been nice to have an east-west crossing that did not require going out of the way of the path of travel simply to connect to the LRT platform. 100m can be a long way, especially when you have short legs!