09-10-2019, 11:19 AM
(09-10-2019, 11:09 AM)panamaniac Wrote: Does the Glove Box office project have its own thread, separate from the condo tower thread?
I think so: https://www.waterlooregionconnected.com/...=glove+box
Garment Street Condos | 25 & 6 fl | U/C
|
09-10-2019, 11:19 AM
(09-10-2019, 11:09 AM)panamaniac Wrote: Does the Glove Box office project have its own thread, separate from the condo tower thread? I think so: https://www.waterlooregionconnected.com/...=glove+box
09-10-2019, 11:26 AM
Thanks! I'm not able to delete my post, above, for some reason, but I copied the relevant part of it in the correct thread.
09-11-2019, 09:12 AM
Second crane base is set in rebar behind Huck glove
09-11-2019, 09:36 AM
2 cranes at the same time, 2 buildings going up. Does Glove Box get worked on after these 2 buildings or concurrently?
09-11-2019, 10:17 AM
09-11-2019, 01:41 PM
Ya that's my thinking too. It was all contingent on having a major leaseholder. Now they do. Go time.
I'm guessing steel for the office component?
09-11-2019, 05:44 PM
09-12-2019, 11:15 AM
That was the comparison I was making too.
09-24-2019, 10:42 AM
Crane going up now
09-24-2019, 10:53 AM
09-24-2019, 11:06 AM
I'd be guessing yes
09-24-2019, 12:06 PM
Nice. Crane city is in full swing.
09-24-2019, 05:47 PM
(This post was last modified: 09-24-2019, 05:50 PM by jwilliamson.
Edit Reason: Added picture
)
The crane tower and counterweight boom are up.
11-13-2019, 06:59 PM
Hello, does anyone have any recent photos of
the site? Could you please post some? Thanks
04-07-2020, 08:08 AM
Are they still working or is there a shutdown of this site?
|
« Next Oldest | Next Newest »
|