04-07-2020, 08:22 AM
Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
Login or Create an Account
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
Login or Create an Account
Thread Rating:
Garment Street Condos | 25 & 6 fl | U/C
|
04-07-2020, 11:36 AM
(11-13-2019, 06:59 PM)JK2021 Wrote: Hello, does anyone have any recent photos of If anyone else is looking for updates, look at the 100 Victoria thread, https://www.waterlooregionconnected.com/...10&page=31 . The photos posted there cover both buildings, but no one is posting in this thread.
04-16-2020, 04:40 AM
(04-07-2020, 08:22 AM)mastermind Wrote:When I drove by, they were still working on the glove box, the crane and workers on the roof.(04-07-2020, 08:08 AM)Momo26 Wrote: Are they still working or is there a shutdown of this site?
04-16-2020, 09:33 AM
(04-16-2020, 04:40 AM)Square Wrote:(04-07-2020, 08:22 AM)mastermind Wrote: Still working. I think Glove Box is shut down because it is an office building, but Garment St Condos and 100 Victoria Tower 2 are residential and therefore still on the essentials list.When I drove by, they were still working on the glove box, the crane and workers on the roof. Shhh! Don't tell Doug Ford ....
04-16-2020, 02:58 PM
(This post was last modified: 04-16-2020, 05:17 PM by white_brian.)
Today it looked like they were getting ready for the 2nd level above the old factory
04-16-2020, 03:13 PM
08-13-2020, 08:28 AM
Looks like the first floor of the tower is almost complete
08-13-2020, 10:37 AM
Pre-cast concrete slabs or old school method?
08-13-2020, 11:45 AM
I couldn't get a good enough look. I think it is traditional due to all the concrete forms laid about the podium top
08-14-2020, 04:53 PM
Yes for sure it is a fully cast in place concrete structure on this one.
08-15-2020, 01:43 AM
I think I asked in another thread but honestly don't recall the conclusion...is pre cast or poured on site better for structural integrity etc.?
08-15-2020, 07:44 AM
(08-15-2020, 01:43 AM)Momo26 Wrote: I think I asked in another thread but honestly don't recall the conclusion...is pre cast or poured on site better for structural integrity etc.? It’s an engineering tradeoff. Sufficient control over the setting process can be obtained in a factory or on a construction site; it’s really a matter of what are the costs and how certain of the outcome can one be.
08-28-2020, 09:10 AM
Condo tower appears to be starting on its second floor now above the podium. It won't be long before Tower 2 at 100 Vic tops out an this one is chasing after.
08-28-2020, 09:48 AM
Rapid progress indeed. Any retail or anything take up the ground floor space at One Hundred Condos yet?
08-28-2020, 10:56 AM
|
« Next Oldest | Next Newest »
|
Users browsing this thread: 3 Guest(s)