11-06-2018, 11:39 AM
(11-06-2018, 10:29 AM)welltoldtales Wrote: The other major issue is half the build is engendered to having two-way all day GO, but that isn't a formality. Right now the MOU has been signed but who knows what happens over the medium to long-term. There hasn't been movement on the key pieces to building two-way, such as electrification or expanded access over the highway. They are still in EA mode and things can change pretty drastically during that process.
Does the scheduling of GO Trains impact the build of the hub though?