06-25-2015, 07:34 AM
(06-24-2015, 09:47 PM)ijmorlan Wrote:(08-25-2014, 05:22 PM)Spokes Wrote: In June 2012 three proposed concepts were put forth:
And none of them feature a weather-free transfer between the LRT and the mainline train platform. I don’t expect every building within 100m of the LRT to be linked to a fully-enclosed LRT station but not to take the opportunity of building a new LRT line and a new transit hub at the same time with fully protected links between the different modes simply makes no sense.
I never really thought about it that way, but you're right. And it does make no sense.