05-01-2024, 09:27 AM
East Ave between Frederick and Krug is about ready to start road reconstruction. Equipment and materials have been dropped on the boulevards, and the overhead power lines are all strung with orange flags. I've been looking forward to this one - they're separating out the cycle tracks, and putting huge curb bumpouts at Chapel that appear to be paired with the 'continuous sidewalk' model they've implemented on Highland. They've marked out on the drawings which trees will need to come out, but also where they propose to plant new trees, and it looks like they're doing full replacement with primarily native tree species.
https://www.engagewr.ca/eastavenue
https://www.engagewr.ca/eastavenue