WIn order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
SIXO Midtown | 28 + 20? + 12? + ? fl | Proposed
Just so they're all here for reference:

[Image: Humphreys-Partners-Urban-Architecture-Ki...igpurk.jpg]

[Image: Humphreys-Partners-Urban-Architecture-Ki...igpurk.jpg]

[Image: Humphreys-Partners-Urban-Architecture-Ki...16r8xs.jpg]

[Image: Humphreys-Partners-Urban-Architecture-Ki...jwsn40.jpg]
Reply
In Waterloo and Kitchener, I'd say second storey stores are about the most unpopular option for businesses. The number of steps, turns, and storeys required for someone not living here to get to the stores is going to be a huge encumberance. You have the central hub for all non-car transportation in the region across the road, nearly, but you're going to make it hard/unpleasant for them to get to you? This seriously needs more thought.
Reply
Why are multiple levels acceptable for indoor shopping malls, but unacceptable for core downtown retail?

My mind boggles, I have seen multiple levels of (successful) retail in so many cities that I fail to understand why it cannot work in Kitchener.
Reply
Not a huge fan of the retaining walls and I imagine it would be possible to grade the site so they'd be unnecessary. I think multiple floors of retail could work here, there are a lot of units planned for the side with the three towers so there will be some customers that are only an elevator ride away from the retail. I kind of like the rest of the design, the towers are kinda something that looks like it belongs on the cover of simcity 2000 but I don't think that's a bad thing. I'm excited for the potential of this site.
Reply
In order to not have any retaining wall, the grade on the site would need to follow (the fairly steep) grade on the street.  It makes the building design much more challenging.  For perspective, I did some rough estimating of the retaining wall length using Google Maps.  It looks like there would be two roughly 50m sections on either side of the entrance lanes.  Each one of those is about 50% primarily greenery, and 50% (25m) of primarily concrete.  That's about 20 seconds (x2) of walking past concrete at a moderate walking speed of 5 km/h.

   

As for second floor access, escalators are an simple way to make access to other floors easier.  And not that expensive in the big picture.
Reply
If the retaining walls are set far back enough (maybe just an additional meter or 2, making the sidewalk 3-4 meters wide, I dont think it would even be that big a deal. Maybe throw in some nice street lamps, or hanging planters. Could be nice.
Reply
(04-08-2016, 03:24 PM)GtwoK Wrote: If the retaining walls are set far back enough (maybe just an additional meter or 2, making the sidewalk 3-4 meters wide, I dont think it would even be that big a deal. Maybe throw in some nice street lamps, or hanging planters. Could be nice.

An excellent suggestion.  Really no extra cost and no significant impact on the proposal.
Reply
(04-08-2016, 07:39 AM)MacBerry Wrote:
(04-07-2016, 02:41 PM)Elmira Guy Wrote: Not sure why you quoted my post with your comment, jordan2423. Doesn't seem to make a lot of sense, but then hey. I went to Laurier for my undergrad. What do I know?

Ya it is tough, Elmira Guy, I too went to Laurier and can't figure out how I manged to get three additional graduate degrees following an undergrad degree from such a "joke" (jordan2423) higher education institute. What do I know?

Words can make you friends or enemies, choose wisely!

lol now I'm being ambushed. It was a joke, no need to take offence. I apologize.
Reply
(04-08-2016, 03:11 PM)tomh009 Wrote: Each one of those is about 50% primarily greenery, and 50% (25m) of primarily concrete.  That's about 20 seconds (x2) of walking past concrete at a moderate walking speed of 5 km/h.

The problem isn't really the 2 sections of 25m of retaining wall, it's the fact that the entire 150m frontage on the sidewalk is inactive. Either a retaining wall, generic hedges, or a gaping void for a pathway that eventually leads to... somewhere.

All I want is for them to extend a concrete path above that garage entrance and bridge over the pedestrian canyon, so that you can walk parallel to King, but at the shops level.
Reply
(04-08-2016, 04:13 PM)Markster Wrote: All I want is for them to extend a concrete path above that garage entrance and bridge over the pedestrian canyon, so that you can walk parallel to King, but at the shops level.

Yes, and ultimately connect that to the north rail platform and/or proposed trail on the overpass.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 2 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links