In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 9 Vote(s) - 3.67 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Vertikal (471-481 King St E) | 23 & 19 fl | U/C
More crane segments being off loaded today at lunch
Reply


(01-06-2020, 02:10 PM)white_brian Wrote: More crane segments being off loaded today at lunch
This is good news! Did it look like the rest of the crane was ready to go up or are more segments still needed?
Reply
It appeared to be the top segments
Reply
(01-06-2020, 03:53 PM)white_brian Wrote: It appeared to be the top segments

Nice! Can't wait for the first poster to post a picture!
Reply
(12-21-2019, 03:33 PM)ZEBuilder Wrote:
(12-21-2019, 03:30 PM)Square Wrote: Is Drewlo the developer on the Fallowfield towers?  If so, the construction was way smoother then this one, even crane wise, lol

I believe so. Those tower's were much smoother than this project.

I've heard that Drewlo has tons of projects going on and only started this one because they had to to get the development charge exemption thing.  Apparently it's only a small crew for now but will pick up at some point once crews become available.
Reply
That makes sense. I think they have a significant presence in London and Sarnia too
Reply
they have some of the first floor walls going up on the Madison/king tower and the Cameron/Charles tower still has seemingly nothing going on. all of the first floor walls have gone up in the past week, they were moving tower crane segments around so they could get unload rebar and to get a cement truck in the right location.
Reply


Rest of the tower crane is likely going up today since they brought in a bigger crane. Yesterday they assembled the jib with the excavator and mobile crane. If it is going up I'll try to get some pictures.
Reply
(01-14-2020, 09:00 AM)ZEBuilder Wrote: Rest of the tower crane is likely going up today since they brought in a bigger crane. Yesterday they assembled the jib with the excavator and mobile crane. If it is going up I'll try to get some pictures.

Thank you for the update.  This is for the Madison tower?, do they have the crane parts for the Cameron tower?
Reply
(01-14-2020, 02:51 PM)Square Wrote:
(01-14-2020, 09:00 AM)ZEBuilder Wrote: Rest of the tower crane is likely going up today since they brought in a bigger crane. Yesterday they assembled the jib with the excavator and mobile crane. If it is going up I'll try to get some pictures.

Thank you for the update.  This is for the Madison tower?, do they have the crane parts for the Cameron tower?
 they might have the crane parts for the cameron tower onsite because there looks to be to many pieces for just one tower but i could be wrong. but they are definitely putting the madison tower crane up.
Reply
first tower crane is going up it looks like it will be finished tomorrow. they took out the other crane base is there any reason for that? does it mean theirs only one tower crane for this site? the crane that they are using to erect the crane is a Terex Demag ac250-1. This picture was taken from market square ion platform:     
Reply
(01-14-2020, 04:44 PM)ZEBuilder Wrote: first tower crane is going up it looks like it will be finished tomorrow. they took out the other crane base is there any reason for that? does it mean theirs only one tower crane for this site? the crane that they are using to erect the crane is a Terex Demag ac250-1. This picture was taken from market square ion platform: 
Honestly, when people were talking about there being TWO cranes here, I thought that was crazy.

I don't know much about construction projects of this size but this site seems a bit small to have two.
Reply
(01-14-2020, 04:56 PM)DK519 Wrote:
(01-14-2020, 04:44 PM)ZEBuilder Wrote: first tower crane is going up it looks like it will be finished tomorrow. they took out the other crane base is there any reason for that? does it mean theirs only one tower crane for this site? the crane that they are using to erect the crane is a Terex Demag ac250-1. This picture was taken from market square ion platform: 
Honestly, when people were talking about there being TWO cranes here, I thought that was crazy.

I don't know much about construction projects of this size but this site seems a bit small to have two.
Idk. Garment St has 3. I know it's a bigger site but is it triple this?
Reply


(01-14-2020, 06:07 PM)Bjays93 Wrote:
(01-14-2020, 04:56 PM)DK519 Wrote: Honestly, when people were talking about there being TWO cranes here, I thought that was crazy.

I don't know much about construction projects of this size but this site seems a bit small to have two.
Idk. Garment St has 3. I know it's a bigger site but is it triple this?

I'm not sure that Garment is much larger, if at all, than this site.

Yet another mystery which remains unsolved. I'm convinced it's some sort of conspiracy theory and it's all linked to DTK and City Hall. Heads will spin when the bizarre truth is revealed. Until then...
Reply
(01-14-2020, 06:44 PM)jeffster Wrote:
(01-14-2020, 06:07 PM)Bjays93 Wrote: Idk. Garment St has 3. I know it's a bigger site but is it triple this?

I'm not sure that Garment is much larger, if at all, than this site.
if you calculate the size by the area of the buildings that are going in garment is only bigger by 150 square meters. site size garment is definitely bigger. if you do the math at garment it is one crane per 2833.338 square meters which would mean by the same ratio drewlo would need 2.94 tower cranes. so if drewlo is to be one big crane its boom would need to be about 80 meters long from a rough estimate based upon GIS mapping and google maps. that boom is honestly too long and they don't have enough pieces for a boom of that length unless they are bringing in more. so a second could be coming later just in a different spot. i will update tomorrow. this project has been done so far in such a illogical way that in no longer makes any sense.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 3 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links