In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
All Quiet on the WR Connected Front
#16
There are all of the new apartment builds plus there are a lot of small infill builds where a SFH was torn down to build a semi or fourplex. It seems like every week I pass a new infill project. I would post about these but it is too difficult to find the appropriate thread. Also new apartments stacked townhome projects in the suburbs.
Reply


#17
I follow house prices quite closely and in addition to the dropping condo prices, existing home prices continue to fall. A growing number of listings for existing SFH starting with a 6 and even some with a 5. Some of them could use some work but most are move-in ready. As a home-owner with a paid off house, I am happy for these continuing dropping prices to allow more people to be able to afford to enter the housing market.
Reply
#18
This forum is not just about development projects. There are other threads. Reddit has posts every day about the goings-on in the region.
Reply
#19
(10-22-2026, 03:22 PM)KingandWeber Wrote:
(10-22-2026, 04:30 AM)danbrotherston Wrote: Alright, now that we've all checked in as lurkers. Are we actually going to do anything about this?

I'm not sure how much there is to do. There's a huge chill on development overall right now to the point I'm not sure there's even one project underway/close to construction in the Region that I'm excited about. For a development forum, that's a tricky thing to navigate!

While there may not be interesting stuff happening there is still a substantial amount of development happening. There really just isn't many cranes up compared to the past. I know I've got a summers worth of drone photos for pretty much all of KWCs projects both big and small. I just haven't had the time to go through and post them yet.

In terms of mid to highrise developments you have the following under construction in Kitchener:
  • 249 West Oak Trail (topped out)
  • Franklin Flats (4th building is topped out)
  • Stride on Franklin (few floors before top out)
  • Weber Yards (Tower C is being built with B following)
  • 3241 King Phase 2 (Half way up)
  • 25 Sportsworld Crossing Tower A (topped out)
  • 1295 Bleams (topped out)
  • Metz Tower A-C (B and C are topped out)
  • 63 Courtland (topped out)
  • Knossos Duke St (topped out)
  • Eureka (topped out, occupancy should be soon)
  • 864 King Tower A (21 of 45)
  • Station 8 and Affordable Housing (site prep)

In Waterloo you've got the following:
  • Quiet Place (Foundation works completed, Tower 1 and 2 podium is complete, Tower 1 is now rising)
  • 115 Park (about half way up)
  • Short St (topped out)
  • UW Math 4 (topped out)
  • UW Student Residence (topped out)
  • Allen Square Redevelopment (topped out)
  • There's the project up by RIM that I haven't seen that I believe is under construction as well.

In Cambridge you don't have much, mind you I don't venture that way so I may be missing some things:
  • 255 King (shoring completed, Tower A and B foundation is done, Tower A is rising)
In Elmira you also had a multi floor building go up this summer that we don't even have a thread for, it's down in the subdivision along Listowel Rd and is a HIP building, it's 7 or 8 floors if I recall correctly. They're also starting work on one of the affordable housing projects along Arthur behind the Shoppers.

Infrastructure projects are also relatively active right now with the Frederick St replacement, the Metrolinx bridge across the Grand River (complete replacement), Mannheim Side Stream project (all containers are in place), and the Spring Valley Pumping Station Replacement. The site prep for the Grand River Bridge for Hwy 7 occurred this summer and proper construction should be starting next year (the CM contract was out for bid already), you'll also have the Cedar Creek and 401 interchange being replaced.

There is also a bunch of behind the scenes work happening on some projects that will get the green light soon including another building at Highland and Ira Needles (Savic Homes + RoW affordable housing), the Fischer Hallman and Rosenberg affordable housing (Schlegel + CoK), and the Mooregate affordable housing project (Unknown developer + Region). Some or all of those will likely be part of the next water capacity increase for Kitchener.
Reply
#20
(10-22-2026, 11:38 PM)Acitta Wrote: This forum is not just about development projects. There are other threads. Reddit has posts every day about the goings-on in the region.

So much of the non-development discussion that used to happen here is now on Facebook or Reddit or maybe other places I don't even realize exist. Forums in general are not the gathering spaces for niche communities that they used to be.
Reply
#21
(10-23-2026, 11:47 AM)greybird Wrote:
(10-22-2026, 11:38 PM)Acitta Wrote: This forum is not just about development projects. There are other threads. Reddit has posts every day about the goings-on in the region.

So much of the non-development discussion that used to happen here is now on Facebook or Reddit or maybe other places I don't even realize exist. Forums in general are not the gathering spaces for niche communities that they used to be.

This is generally true, but it doesn't have to be specifically true. I did feel at some point this place had some level of community. I don't get that sense anymore though. Its' basically a ghost town Sad
Reply
#22
For those who have yet to vote municipally, CBC Kitchener-Waterloo has collected all of their coveragei one spot: Waterloo Region Votes 2026


Quote:CBC K-W reached out to candidates in the municipal election and asked them to take part in a candidates survey.

They were asked the following questions:
  • Briefly describe what your top 3 priorities are in this election.
  • Explain how you would address priority #1.
  • Explain how you would address priority #2.
  • Explain how you would address priority #3.
  • What else do you want voters to know about you and your campaign?
Candidate responses are below. CBC K-W has not edited these responses for editorial purposes, but small changes may have been made for style or spelling.

Candidates who do not have responses below can still submit the survey and can email CBC K-W for the link if they don't have it.

Voters go to the polls on Monday, Oct. 26.


Most candidates responded. Those who did not were not listed.

There is quite the field of candidates out there.  As a veteran of helping someone the campaign trail in the previous municipal elections, hats off to everyone putting in the effort to stand for election.
Reply


#23
(10-23-2026, 12:31 AM)ZEBuilder Wrote:
(10-22-2026, 03:22 PM)KingandWeber Wrote: I'm not sure how much there is to do. There's a huge chill on development overall right now to the point I'm not sure there's even one project underway/close to construction in the Region that I'm excited about. For a development forum, that's a tricky thing to navigate!

While there may not be interesting stuff happening there is still a substantial amount of development happening. There really just isn't many cranes up compared to the past. I know I've got a summers worth of drone photos for pretty much all of KWCs projects both big and small. I just haven't had the time to go through and post them yet.

In terms of mid to highrise developments you have the following under construction in Kitchener:
  • 249 West Oak Trail (topped out)
  • Franklin Flats (4th building is topped out)
  • Stride on Franklin (few floors before top out)
  • Weber Yards (Tower C is being built with B following)
  • 3241 King Phase 2 (Half way up)
  • 25 Sportsworld Crossing Tower A (topped out)
  • 1295 Bleams (topped out)
  • Metz Tower A-C (B and C are topped out)
  • 63 Courtland (topped out)
  • Knossos Duke St (topped out)
  • Eureka (topped out, occupancy should be soon)
  • 864 King Tower A (21 of 45)
  • Station 8 and Affordable Housing (site prep)

In Waterloo you've got the following:
  • Quiet Place (Foundation works completed, Tower 1 and 2 podium is complete, Tower 1 is now rising)
  • 115 Park (about half way up)
  • Short St (topped out)
  • UW Math 4 (topped out)
  • UW Student Residence (topped out)
  • Allen Square Redevelopment (topped out)
  • There's the project up by RIM that I haven't seen that I believe is under construction as well.

In Cambridge you don't have much, mind you I don't venture that way so I may be missing some things:
  • 255 King (shoring completed, Tower A and B foundation is done, Tower A is rising)
In Elmira you also had a multi floor building go up this summer that we don't even have a thread for, it's down in the subdivision along Listowel Rd and is a HIP building, it's 7 or 8 floors if I recall correctly. They're also starting work on one of the affordable housing projects along Arthur behind the Shoppers.

Infrastructure projects are also relatively active right now with the Frederick St replacement, the Metrolinx bridge across the Grand River (complete replacement), Mannheim Side Stream project (all containers are in place), and the Spring Valley Pumping Station Replacement. The site prep for the Grand River Bridge for Hwy 7 occurred this summer and proper construction should be starting next year (the CM contract was out for bid already), you'll also have the Cedar Creek and 401 interchange being replaced.

There is also a bunch of behind the scenes work happening on some projects that will get the green light soon including another building at Highland and Ira Needles (Savic Homes + RoW affordable housing), the Fischer Hallman and Rosenberg affordable housing (Schlegel + CoK), and the Mooregate affordable housing project (Unknown developer + Region). Some or all of those will likely be part of the next water capacity increase for Kitchener.

Thanks, this is a great summary! Definitely true there's lots of developments still underway, albeit many of dubious aesthetic quality. I wish the central transit hub weren't so delayed - that is one building I'm excited about and interested to follow since I think it will dramatically change the landscape of Downtown Kitchener, but it always seems to be a year out from construction.
Reply
#24
Looks like 332 Charles is getting under way. The "pond" has been filled in, sand and gravel packed, and lots of heavy equipment in action.
Reply
#25
Is the heavy equipment actually involved with the site or is it for the King Street reconstruction in that area?
Reply
#26
(11-02-2026, 01:43 PM)creative Wrote: Is the heavy equipment actually involved with the site or is it for the King Street reconstruction in that area?

It is definitely site-specific to 332 Charles. My office is next door. Between this project and the new fire station (and, of course, the King Street reconstruction between Stirling and Ottawa), anyone with a workplace or residence between Eby and Stirling is going to be dealing with construction noise and generalized chaos for the next couple of years.
Reply
#27
(10-17-2026, 07:13 PM)tomh009 Wrote:
(10-17-2026, 06:24 PM)creative Wrote: How do you search on your phone? I was going to suggest dropping threads and just allow posting to a single thread.

Had to go check this...indeed there is no search visible at all with the FocusResponsive theme! Why that is baffles me. Maybe @Spokes can shed some light on this?

If you switch the theme to Default, you do get the search, but it's much harder to read, at least with my phone's screen size. 🤬

Sorry missed this.

I think it's never been available on the theme for some reason, but maybe just mobile?  I'd have to check on a computer tomorrow.
Want to support Waterloo Region Connected?  Get a Premium Membership
Reply
#28
14 Holborn has a sign up now. I was driving so I couldn’t get a photo. A Build Now affordable housing project in the Stanley Park area.

https://buildnowwr.ca/14-holborn-court/
Reply


#29
(11-03-2026, 12:30 PM)creative Wrote: 14 Holborn has a sign up now. I was driving so I couldn’t get a photo. A Build Now affordable housing project in the Stanley Park area.

https://buildnowwr.ca/14-holborn-court/

That project along with the new fire station and a project on Wellington were the first to get water capacity when the Region released the first wave of capacity.
Reply
#30
(10-22-2026, 05:05 PM)creative Wrote: Most of the recently completed condos have been block purchased by corporations at extremely reduced prices. This happened with the Viva Towns and Tek tower.

Hence the rental signage on Tek Tower...
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 1 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links