In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
(10-18-2016, 08:28 AM)kitborn Wrote:
(10-17-2016, 11:13 AM)ijmorlan Wrote: It should get full priority, and the schedule should be planned to use the priority, with a reasonable buffer so that minor problems don’t immediately put the schedule off for the rest of the day. But yes, there should be a schedule and no transit vehicle should ever run “hot” (meaning, leaving a pickup point before the scheduled time).

What I would say is that the schedule should be as fast as possible, subject to being realistic in the face of reasonably foreseeable and reasonably common circumstances.

A early bus/train is no bus/train.

Perhaps I was unclear. The vehicles should follow the schedule, and the schedule should be designed to be as fast as possible subject to the reasonable constraints. But yes, if a particular vehicle happens to run fast over a segment of a route, it should wait at the next stop until it is no longer early, and this should happen often enough that a vehicle never runs noticeably early. Which pretty much means that vehicles should always run 0-1 minute late under ideal circumstances but never ever early.

Because you are absolutely right. Many transit “professionals” don’t seem to understand this. I’ve seen reference to “on-time” meaning plus or minus three minutes (on the TTC, in particular, although I’m sure there are other offenders), which is outrageous and no way to run a transit service.
Reply


Lots of fresh outer curb (both sides) along Duke, Queen to Young. Inner curb staking looks complete should mostly be in be weeks' end I would think.
Everyone move to the back of the bus and we all get home faster.
Reply
I saw that overhead platform lighting has been installed at the Caroline station.
Reply
Reply
Wooden hydro poles being cut down on Charles:
   
Reply
Heard the chainsaws earlier! They're coming down like timber. Big Grin
Reply
So what happens to the stump?
Reply


Not sure, haven't seen a full removal up close yet. At least it would be easier to dig up than a tree stump, I presume.
Reply
1/3 - Wednesday, October 19, 2016

   
Progress on Duke.

   

   
Victoria Park platform edge rework.

   
Embedded track curve from Ottawa onto Charles.

   
Ottawa.
Reply
2/3 - Wednesday, October 19, 2016

   
Ottawa.

   

   
Ottawa/Mill, almost ready to re-open.

   

   
Embedded track curve from Borden onto the Huron Spur: Now complete!
Reply
3/3 - Wednesday, October 19, 2016

   
Embedded track curve from Borden onto the Huron Spur, continued.

   
Uptown Waterloo.

   
Waterloo Town Square's station foundation is, so far, the most involved on the line.
Reply
My goodness is that ever a lot of space between the rails and the east side buildings in UpTown!
Reply
(10-21-2016, 11:31 AM)Viewfromthe42 Wrote: My goodness is that ever a lot of space between the rails and the east side buildings in UpTown!

They must have heard all the pre-construction concerns about the sidewalks at the Kaufman Lofts (which, by the way, turned out to be miles wider than what was there before) and over-compensated. Big Grin Should be great for pedestrians - no complaints allowed, here!
Reply


It's a shame they went with stamped concrete instead of grass between the sidewalk and the road here.


Attached Files Image(s)
   
Reply
Bombardier layoffs won't affect Waterloo region's LRT train production
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 17 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links