In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
504 heading south on the northbound track before being put away for the day:
...K
Reply


Awesome, Kevin! Nice videography, too. Smile
Reply
And off to bed for the day:


(Sorry for the quality, digital zoom only on my phone.)
...K
Reply
So disappointing to see it being put away before 3pm. That’s like 4 hours out on the track.

Where’s the fire?

Can’t wait to watch (and listen!) to your videos when I get home from work.
Reply
(01-23-2018, 04:00 PM)Canard Wrote: So disappointing to see it being put away before 3pm. That’s like 4 hours out on the track.

Where’s the fire?

Can’t wait to watch (and listen!) to your videos when I get home from work.

4 hours on the track (for initial self powered testing) seems reasonable to me...

What fire?
Reply
This is the second time I heard on my scanner that the vehicle lost power and they had to reboot. They mentioned Bombardier staff went on board and started it back up. Maintenance asked if it needed a tow, so maybe that why it finishes testing so early.
Reply
What frequency are they using?

Fire meaning the spring deadline. Get going, guys...
Reply


Fire would imply there are financial penalties for Bombardier, but I believe we've exhausted all ones we'd legally be entitled to. From their perspective, creating a quality system, while focusing energies on orders and issues that still have financial penalties (or future contracts) tied to them would likely be the focus.
Reply
(01-23-2018, 05:57 PM)Viewfromthe42 Wrote: Fire would imply there are financial penalties for Bombardier, but I believe we've exhausted all ones we'd legally be entitled to. From their perspective, creating a quality system, while focusing energies on orders and issues that still have financial penalties (or future contracts) tied to them would likely be the focus.

I don't think Canard was referring to Bombardier... I think he referred to how slow the system testing is going with the trains we do have (which are sufficient for full line powered testing).
Reply
(01-23-2018, 05:50 PM)Canard Wrote: What frequency are they using?

Fire meaning the spring deadline. Get going, guys...

They use the Waterloo Region EDACS Trunk System, here is a link to the system:  https://www.radioreference.com/apps/db/?sid=1783
Reply
(01-23-2018, 05:47 PM)Square Wrote: This is the second time I heard on my scanner that the vehicle lost power and they had to reboot.  They mentioned Bombardier staff went on board and started it back up.  Maintenance asked if it needed a tow, so maybe that why it finishes testing so early.

Interesting.  When I first caught up with it between Bearinger and Quiet Place its side display briefly showed a software version number and then went blank.  I thought that looked like a reboot.

Edit to add:  Hmm, I wonder if that's why the lights at the top of the OCS pole at Bearinger were off even though Iain saw that the one by Northfield was on?  Maybe it wasn't the vehicle that lost power, but the line.

Further edit: Scratch that, someone in the Facebook group mercifully pointed out that what I thought were 'power on' lights were really surge arrestors.
...K
Reply
Sounds like an electrical continuity issue
Reply
(01-23-2018, 05:57 PM)Viewfromthe42 Wrote: Fire would imply there are financial penalties for Bombardier, but I believe we've exhausted all ones we'd legally be entitled to. From their perspective, creating a quality system, while focusing energies on orders and issues that still have financial penalties (or future contracts) tied to them would likely be the focus.

I meant GrandLinq. The optics of having a train come out for "an hour or two" and crawl along once every 3 weeks is pretty upsetting, when we're being told over and over "Oh, it'll open in Spring".

I know these things take time, but... the startup of testing has been agonizingly slow, given the pace of construction that I could barely keep up with.
Reply


(01-23-2018, 06:04 PM)Square Wrote:
(01-23-2018, 05:50 PM)Canard Wrote: What frequency are they using?

Fire meaning the spring deadline. Get going, guys...

They use the Waterloo Region EDACS Trunk System, here is a link to the system:  https://www.radioreference.com/apps/db/?sid=1783

I'm really sorry, I don't understand this. I was expecting a frequency like 161.405 or something like that, that I could program into my scanner. Is that now how this works?
Reply
(01-23-2018, 03:37 PM)KevinT Wrote: Heading from the Quiet Place trail crossing up to Old Albert on the northbound track:

Thank you so much Kevin for being able to capture all of this!  Absolutely spectacular to see.  I can't wait to hear the vocalization.  I really hope it's the same TTS system as on the Toronto streetcars - she's breathtaking!  Heart

Also noted the digitized gong on take-off (yay!) and brake lights (ugh).
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 7 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links