Posts: 4,938
Threads: 155
Joined: Aug 2014
Reputation:
128
I don't believe the LPAT is simply between developers and municipalities. Look at The One Hundred.
Neighbourhood Association?
Posts: 1,935
Threads: 102
Joined: Aug 2014
Reputation:
18
I received a response from LPAT regarding this shown below :
By-law No.2018-071 amends Zoning By-law 85-1 which changes the existing zoning of the subject lands generally North of King St., East of Moore Ave., South of Wellington St. and West of Waterloo St. in the City of Kitchener, from Residential Five Zones (r-5_ with Special Use Provisions 129U abd 411U to High Intensity Mixed Use Corridor Zone (MU-3) with Special Use Provision 468U and Special Regulation Provisions 716R and 717R and from Industrial Residential Zone (M-1) to High Intensity Mixed Use Corridor (MU-3) with Special Use Provision 465U and Special Regulation Provisions 716R, 717R and 718R. These changes would permit the owner to build a new office building, parking garage, a new privately owned park at the corner of Moore Ave. and Wellington St. North, and the reconfiguration of the existing lane.
A local resident has appealed the passing of this bylaw which why there is an LPAT appeal.
Posts: 1,935
Threads: 102
Joined: Aug 2014
Reputation:
18
Very unfortunate to hear a resident has appealed this project.
I have yet to see an urban office tower built in Waterloo Region and I have lived here for 12 years.
Posts: 1,220
Threads: 9
Joined: Oct 2018
Reputation:
56
You'll be seeing one finished I think in the next 1 - 1.5 years on King in Kitchener! Well, it may not qualify as a 'tower'...I think mid-rise at 5 floors?
Posts: 6,716
Threads: 38
Joined: Aug 2014
Reputation:
118
Six floor, iirc. The last office tower built in DTK would be the "Dolly Parton Building" at King and Ontario. What was that, over 25 years ago? And its twin was never built.
Posts: 838
Threads: 10
Joined: Jul 2017
Reputation:
43
I think that, if we're being literal (and this is the internet so clearly we must), a tower is taller than it is wide or long. I don't think 345 King W satisfies that requirement, and probably Phase 2 of the Breithaupt Block didn't either because the original building has at least one fairly long dimension.
Posts: 1,855
Threads: 3
Joined: Oct 2014
Reputation:
164
If they have to spend the money on a hearing, they should take it back to the original plan. That would be interesting.
Posts: 1,220
Threads: 9
Joined: Oct 2018
Reputation:
56
Sorry what's the basis of the resident appealing?
Posts: 6,716
Threads: 38
Joined: Aug 2014
Reputation:
118
If an individual is unsuccessful in an appeal, is LPAT able to order them to pay the developer's/municipality's costs?
Posts: 4,938
Threads: 155
Joined: Aug 2014
Reputation:
128
I would think legal fees yes. Assuming they operate like any other court system