01-15-2020, 12:22 PM
The tower has been capped with the central pivot and control cab, but no arms yet.
Vertikal (471-481 King St E) | 23 & 19 fl | U/C
|
01-15-2020, 12:22 PM
The tower has been capped with the central pivot and control cab, but no arms yet.
01-15-2020, 06:01 PM
no more progress on the crane today but they started installing hoarding around the site. as of the moment they only have the pieces for the crane that is half built.
01-17-2020, 12:07 PM
The counter jib was attached this morning. I expect the jib to be finished today. By the way, that crane looks very tall.
01-17-2020, 01:21 PM
This morning at around 8:30, from a bus.
01-17-2020, 02:32 PM
01-17-2020, 04:12 PM
(01-17-2020, 02:32 PM)jeffster Wrote:(01-17-2020, 12:07 PM)jgsz Wrote: The counter jib was attached this morning. I expect the jib to be finished today. By the way, that crane looks very tall. It looks taller than the crane at DTK. By the way, the jib and counter jib are now up.
01-17-2020, 04:43 PM
(01-17-2020, 04:12 PM)jgsz Wrote:(01-17-2020, 02:32 PM)jeffster Wrote: It is taller compared to some as a starting point. It will get taller once it starts progressing too. DTK is very short, especially considering it's going to top out at close to 400 feet.
01-17-2020, 04:52 PM
01-17-2020, 06:07 PM
(01-17-2020, 04:43 PM)jeffster Wrote:(01-17-2020, 04:12 PM)jgsz Wrote: It looks taller than the crane at DTK. It's the sort that will rise along with the building below it.
01-17-2020, 06:21 PM
[attachment=6682]
01-17-2020, 07:56 PM
Is it me, or is that a super long jib? And if that's the case, I can't imagine them needing two cranes, but I am probably wrong.
(01-17-2020, 07:56 PM)jeffster Wrote: Is it me, or is that a super long jib? And if that's the case, I can't imagine them needing two cranes, but I am probably wrong.that is exactly what i was thinking, it could just be perspective from looking up and not being able to see the ground but it doesn't look as if it reaches the far corner of the cameron/charles tower. Edit: You can see in westwardloo's post that they are on the side of Cameron closest to the site. Because of that and the fact that the boom doesn't go onto Cameron we draw a radius around that tower crane on GIS mapping and it misses the Charles/Cameron tower's corner by 4-5 meters so they are going to need another crane or something. But like we've all said this is the wierdest site ever so who at this point knows if they will add another crane.
01-18-2020, 12:11 AM
With that weird base they have this crane on, maybe it will float to the Cameron tower?, lol
01-18-2020, 02:13 AM
They have 2 cranes bases and have for months...
01-18-2020, 08:53 AM
|