Quote:Flair Airlines says it is “very pleased” with the level of interest and bookings out of the Region of Waterloo International Airport.
“We’re definitely happy with the performance in Kitchener-Waterloo so far,” said Garth Lund, Flair’s chief commercial officer, in an interview Friday.
[...]
Flights out of the regional airport have been almost fully booked, he said. “Certainly July and August have been better than I expected,” he said, with flights to Halifax and the West Coast being the most popular.
From https://www.cambridgetimes.ca/news-story...l-airport/
Posts: 3,806
Threads: 61
Joined: Jul 2015
Reputation:
187
10-19-2021, 06:07 PM
(This post was last modified: 10-19-2021, 06:07 PM by ac3r.)
Surprised this hasn't been posted yet. The Region of Waterloo approved an 11 million dollar expansion project to double the size of the terminal as they project 1 million passengers to travel through the airport by next year: https://www.regionofwaterloo.ca/modules/...48db114b63
Posts: 6,459
Threads: 38
Joined: Aug 2014
Reputation:
84
It will be interesting to see what the prefab buildings will be like. I’m looking forward to renewed service to YOW.
Posts: 1,465
Threads: 5
Joined: Sep 2014
Reputation:
41
Anything that improves the current tiny baggage carousel and meeting area would be welcome.
Posts: 1,514
Threads: 13
Joined: Aug 2014
Reputation:
122
10-19-2021, 10:42 PM
(This post was last modified: 10-19-2021, 11:13 PM by taylortbb.)
For anyone curious about what they're doing, go to https://regionofwaterloo.bidsandtenders....4c7d7af31/ and download the document "Section F - Drawings & Technical Specifications".
Here's the overview render. I added the red box around the existing terminal building, everything else is expansion. The bag hall and hold room are "modular relocatable structures" aka semi-fixed tents, which will be built off-site and dropped in. Eventually they'll be replaced by permanent expansion, but I think the logic is that it's better to give it a year or two for planning and figuring out just how big the permanent building should be, might need to be for 2M pax/year.
Posts: 3,806
Threads: 61
Joined: Jul 2015
Reputation:
187
That's a lot bigger than I expected! I can't help but feel like that's a serious gamble, though. While it's only 11 million dollars, Flair could pull out at any time.
Posts: 1,514
Threads: 13
Joined: Aug 2014
Reputation:
122
The new hold room has the capacity for about 3 737s worth of pax, compared to 1 for the current hold room. That's assuming planes that aren't 100% full.
Right now the hold room is seriously overcrowded whenever there's two Flair/WJ flights departing within an hour of each other. Which happens multiple times per week, half the YKF reviews on Google are complaining that the hold room isn't Covid-safe due to crowding. I don't know what they'd do if there was a flight delay, I think they'd have fire code issues.
Given all that, 3 planes worth of pax doesn't seem that crazy for an expansion. It'll let them do two flights at similar times, and handle a delayed flight. That's a pretty basic level of service.
Posts: 1,465
Threads: 5
Joined: Sep 2014
Reputation:
41
So the next question would be: where would they build the permanent expansion should it be required? Would "Terminal 1" (this one) remain in service while a larger "Terminal 2" is built. Then "Terminal 1" is demolished, ready to build "Terminal 3" and YKF would then have a domestic and international terminal? Or maybe one big terminal built in two parts over a decade?
Posts: 3,806
Threads: 61
Joined: Jul 2015
Reputation:
187
I think they'd use some of the adjacent parking lots for a future terminal. Whether or not they'd be connected would remain to be seen, but I would think that having them condensed into one structure would be ideal for the day to day operations. I doubt we'd see another terminal built for a long time though.
Posts: 1,693
Threads: 3
Joined: Oct 2014
Reputation:
126
During the official Plan there was a sketch showing a new terminal to be built on the northwest side of runway 08/26.
Posts: 1,514
Threads: 13
Joined: Aug 2014
Reputation:
122
The airport master plan shows proposed terminal layouts up to a capacity of 2.5M pax/year in 5 stages, below is the final version. The terminal is the hockey stick-shaped blue building, the large adjacent blue building is a parking garage.
The part of the terminal on the right is where the current terminal is, and they show the phases as progressive extensions of the longer thinner section toward Fountain St. Past 1M pax/year the plan calls for pretty much completely replacing the building though, as it becomes a 2-3 floor building with separate arrival and departure levels.
Posts: 1,514
Threads: 13
Joined: Aug 2014
Reputation:
122
https://twitter.com/flywithpivot/status/...6260596737
https://skiesmag.com/news/pivot-airlines...vice-2022/
Pivot's services from YKF to Ottawa and Montreal will be launching early 2022, with ticket sales starting Nov 1.
Posts: 3,806
Threads: 61
Joined: Jul 2015
Reputation:
187
10-27-2021, 06:27 PM
(This post was last modified: 10-27-2021, 06:29 PM by ac3r.)
Nice! While I live in Toronto most of the time, I rarely fly out of YKF so I'll have to use this as an excuse to do that and visit Montréal again. I'll be curious to see what the flights cost.
Posts: 1,969
Threads: 18
Joined: Aug 2014
Reputation:
37
(10-27-2021, 06:27 PM)ac3r Wrote: Nice! While I live in Toronto most of the time, I rarely fly out of YKF so I'll have to use this as an excuse to do that and visit Montréal again. I'll be curious to see what the flights cost.
Value brand for the business customer, they say to Skies Mag, with tickets between $179 and $229 one-way. I could see taking the train one way and the plane the other way. I go to Montreal pretty often and try to drive at most once per year.
Posts: 3,806
Threads: 61
Joined: Jul 2015
Reputation:
187
That's not bad then. I make truck loads of money so that's easily affordable. If it means avoiding Pearson I'd even pay more, that airport is atrocious.
|