04-28-2021, 03:28 PM
(This post was last modified: 04-30-2021, 02:08 PM by kps.
Edit Reason: tpyo
)
(04-28-2021, 10:59 AM)Coke6pk Wrote: I noticed in one of the shots, there appears to be a pathway across the King St bridge. Will this be a connection to s/b iON? I just assumed when it was banished as being a train platform that it would mean it couldn't be a pedestrian corridor either.
As far as I know the crossing is still planned, and the plan is to have a trail to Stewart St to meet the trail on the other side of Park that connects to the IHT. The crossing is separate from the transit hub project, though, and I think it's Metrolinx's project rather than the Region's.