12-03-2019, 06:51 PM
I was in DTK (downtown Kitchener) today and noticed the crane for DTK (Duke Tower Kitchener) was operating. So that's a good sign.
Duke Tower Kitchener | 39 fl | completed
|
12-03-2019, 06:51 PM
I was in DTK (downtown Kitchener) today and noticed the crane for DTK (Duke Tower Kitchener) was operating. So that's a good sign.
12-05-2019, 02:48 PM
(12-02-2019, 10:10 PM)ZEBuilder Wrote:(12-02-2019, 08:45 PM)Lens Wrote: It's this crane rented? If so what company (don't see a name on it)? I assumed they found it in a scrap yard somewhere...if you look on the blue part of the crane in the last pictures that JGSZ posted it says dominion if that helps at all. Dominion is the name of the concrete forming trade, so I guess it's not a rental. [/url][url=http://www.dominionforming.com/home.html]http://www.dominionforming.com/home.html
12-05-2019, 03:35 PM
2019-12-05
Today they used a mobile concrete placing boom instead of the more permanent boom. I have no idea why they would do that.
12-05-2019, 04:30 PM
(12-05-2019, 03:35 PM)jgsz Wrote: 2019-12-05It probably has something to do with the positioning of the placing boom. To get to that corner you have the tower crane to deal with but when the actual tower starts you don't need that corner as that corner is just podium. So they won't need to reach that corner.
12-05-2019, 06:20 PM
So, is this building one floor from Duke Street completed? Thank you.
12-05-2019, 06:46 PM
(12-05-2019, 06:20 PM)Square Wrote: So, is this building one floor from Duke Street completed? Thank you.The building is one floor above grade on the Duke Street side yes. The entire first floor of the podium is yet to be finished tho. I suspect what we see right now is close to what the footprint of the building that rises above the podium will be
12-06-2019, 11:58 AM
The podium is three stories correct?
12-06-2019, 12:22 PM
12-06-2019, 12:32 PM
12-06-2019, 05:42 PM
(12-06-2019, 12:32 PM)ZEBuilder Wrote:It is 4 floors facing Duke.(12-06-2019, 12:22 PM)panamaniac Wrote: Five, isn't it?It's 3 floors fronting Duke and five at the back where the parking garage is. 1 - story retail/ garage entrance. 2-4 - story residential 5- story condo rooftop patio garden. 5 stories facing fredrick.
12-06-2019, 09:45 PM
(12-06-2019, 05:42 PM)westwardloo Wrote:(12-06-2019, 12:32 PM)ZEBuilder Wrote: It's 3 floors fronting Duke and five at the back where the parking garage is.It is 4 floors facing Duke. If I was the developer, I would not put my entrance or exit near the LRT track, just make both on the Frederick side.
12-13-2019, 06:03 PM
2019-12-13
Update. Work continues on two levels. Only the basement is fully covered. The ground floor is still open on the north side. They are putting up walls for the second floor on the Duke Street side.
01-11-2020, 04:35 PM
does anybody have any new pictures of this project?
01-11-2020, 06:31 PM
01-12-2020, 09:01 AM
Yes please!
|